-
The First Locally-Developed Offshore Wind Farm! Taipower’s Offshore Wind Farm Phase II Construction Starts Today, Will Generate 1,000 GWh of Electricity Annually Starting in 2025
-
Power Supply Development and Stabilization Taipower Plans to Issue the Sixth Unsecured Corporate Bonds for 2022
-
Taipower Announces Grid Resilience Strengthening Construction Plan, with NT$564.5 Billion Investment Over 10 Years, Preventing Recurrence of Massive Power Outages
-
Green Energy Investment Program Fundraising Taipower Plans to Issue Fifth Unsecured Corporate Bonds for 2022
-
Building Electrical Grid No Easier than Building MRT Line! Underground Cable Tunnel Deeply Buried in Urban Area After 10 Years, Da’an Shield Tunnel with Excavation Depth Exceeding Taipei 101’s is Nea
-
First in Country, Combining Taipower’s Advanced Metering Infrastructure Big Data with AI Technology Using Apps to Easily Discover the Energy Consumption of Electrical Appliances
-
The Lanyu Low-Level Radioactive Waste Storage Site Has Become an Orchid Restoration Base! Taipower Collaborates with Dr. Cecilia Koo Botanic Conservation Center to Restore Endangered Orchids and Recre
-
2022 Taiwan Sustainability Action Awards Presented Today Taipower’s Offshore Wind Power Phase I Wins Silver Award
-
Taipower Wins Asia Responsible Enterprise Awards for Fifth Consecutive Year Double Winners in Net-zero Strategy and Sports Team Cultivation
-
Power Supply Development and Stabilization Taipower Plans to Issue Fourth Unsecured Corporate Bonds for 2022
-
Taipower promotes energy storage system with MR technology for repair support on Lanyu: Stable power supply during peak travel season!
-
Developing power, stable power supply: Taipower schedules third issue of unsecured general corporate bonds for 2022