Planning of Power Supply for EHV Customers

Once we receive an EHV user's Electricity Usage Plan application, power system analysis will be done based on the customer's site location, amount of power demand, and project timetable, to see whether the application can meet the "TPC Transmission System Planning Criteria". One or several grid connection schemes will then be designed. When the connection scheme is determined, the feasibility in terms of operation and construction of customer lines will be checked. Afterwards, a meeting will be held to discuss which connection scheme is optimal with respect to power system planning, operation, customer line (overhead line or underground cable) construction time, and cost. According to the meeting minutes, an official letter will be issued to inform the customer of the assessment result of the power demand project application.

For the customer who wants to build a new cogeneration power plant, a system impact report, which could be written by Taipower or academic institutions, should be sent to Taipower along with the power demand project application. For customers who would like their report written by Taipower, please contact the Department of System Planning of Taipower.