During 1991-1996, the power development plan of Taipower was blocked due to the increase in people's awareness of environmental protection. As a result, the reserve margin of power supply in summer was only 5%, and results in 14 times of energy rationing in 1991 and 16 times of energy rationing in 1994. It affects the economy, society and people's livelihood. To solve the problem of insufficient electricity, the Ministry of Economic Affairs opened the market for independent power producer (hereinafter referred to as IPP) in 1995. Taipower purchases the electricity generated by these IPPs. Since then, IPPs have become a vital source of electricity supply in Taiwan. 

Independent Power Producer (IPP) Installed Capacity (MW) Fuel
Mai-Liao Power Company (Note1) 1,800 Coal
Ho-Ping Power Company 1,308.55 Coal
Ever Power Company (Note2) 900 Natural gas
Chia-Hui Power Corporation 700 Natural gas
Hsin Tao Power Corporation 630 Natural gas
Star Energy 496.9 Natural gas
Sun ba power 990 Natural gas
Kuo Kuang Power Company 465 Natural gas
Star Buck Power 516 Natural gas
Chia-Hui Phase II 510 Natural gas
Sun ba power II 1,100 Natural gas

Note:
1. Mai-Liao Generator#1 expired on 2025.12.31、Mai-Liao Generator#2 expired on 2024.09.08、Mai-Liao Generator#3 expired on 2025.09.22.
2. Ever Power Generator#2 expired on 2025.07.23.

 